The challenge
Hurricane recovery left six substations without mains power for the better part of a week, at exactly the moment copper theft risk peaked.
The solution
Solar and battery units deployed ahead of landfall, monitored from a regional operations centre well outside the affected area.
The results
Not a single hour of coverage was lost across the six sites. Units ran 72 hours off-grid without intervention, and the regional operations centre kept watch throughout the period when every fixed camera on the estate was dark.

Results
The numbers that mattered to the client
The grid went down. The watch did not.
Book a demo0
Hours of coverage lost
72h
Autonomous runtime off-grid
6
Substations protected